Return to Governor's Proposed Transportation Program table of contents
Urban/Rural Mobility Program Project List Preliminary Engineering and Right-of-Way Projects Governor’s Transportation Revenue Proposal Dollars in Thousands Project Title Phase State Funds NE 175th Street to NE 205th Street North Bound Auxiliary Lane PE 799.0 196th Street SW (State Route 524) Collector/Distributor Lanes PE 403.9 Mt Vernon, Bellingham & Marysville Advanced PE 85.0 State Route 9/State Route 2 Interchange Modifications: Ramps, Signals PE 340.0 Weyerhaeuser Way to State Route 167 Truck Climbing Shoulder Lane PE 426.6 Battery Street Tunnel to N 115th Street HOV Lane Conversion PE 145.0 State Route 167 Interchange Modification Southbound 405 to Southbound Route 167 Ramp Modification PE 999.9 Coal Creek Parkway to State Route 5 HOV Lane Restriping, Move HOV Lane From Outside to Inside PE 450.0 Paradise Lake Road to Snohomish Road Widen to 4 Lanes PE 600.0 43rd Avenue NE to 67th Avenue NE Widen to 5 Lanes PE 255.2 I-5 to International Boundary Stage 1: D Street to International Boundary Widening & Border Crossing Improvements PE 463.0 I-5 to International Boundary Stage 1: D Street to International Boundary Widening & Border Crossing Improvements RW 72.4 Pioneer Way to Stratford Road Widen to Four Lanes RW 100.0 Junction State Route 2/97 to 9th St Construct Two-way Left Turn Lane PE 230.0 204th Street to 176th Street Widen from 2 to 5 Lanes RW 48.2 36th to Jovita Widen Existing Roadway to 5 Lanes RW 100.0 234th Street E to 204th Street E Widen From 2 to 5 Lanes RW 1.9 Hostmark Street to Bond Road Widen From 3 Lanes to 5 Lanes PE 100.0 State Route 5 Overcrossing Reconstruct Interchange RW 561.9 Ward Road to 162nd Avenue Widen From 2 to 4 Lanes RW 931.8 Ryegrass Summit to Vantage Construct Auxiliary Lane Westbound PE 250.0 State Route 182 to Richland Way Construct Additional Lanes PE 300.0 Richland Way to Columbia Center Boulevard Construct Additional Lanes PE 180.0 Pines Road to Sullivan Road Additional Lanes PE 250.0 Argonne Road to Pines Road Additional Lanes PE 250.0 TOTAL $8344.3 PE = Preliminary engineering RW = Right-of-way